Testing & Commissioning

Steam Turbine Maintenance and Commissioning Services Project

Project Summary

Completed equipment maintenance, component replacement, and full-load testing for a steam turbine power generation system.

On-site inspection and system adjustments restored stable operation and reduced the risk of unexpected shutdowns.

Project Overview

  • Client: Zhongtai Resources Taoyuan Plant
  • Services: Steam turbine inspection, pure water system inspection, turbine oil filtration system inspection, component replacement, system calibration, and full-load testing
  • Location: Taoyuan, Taiwan

Project Challenges

Steam turbine power systems often operate under high loads for long periods. Component wear, system aging, and parameter deviation may gradually affect performance.
Unexpected shutdowns can increase maintenance costs and interrupt production.
The project therefore required a complete inspection and timely restoration of stable operation.

Solution

Zhen Yi’s technical team conducted on-site inspections of the steam turbine, pure water system, and turbine oil filtration equipment.
Necessary component replacement, maintenance, and parameter adjustments were completed based on equipment condition.

Functional checks were also carried out on the UPS, DCS control system, and related equipment.
A full-load test was then performed to verify operating stability.

Project Outcomes

After maintenance and full-load testing, the steam turbine power generation system returned to stable operation.
The main operating parameters met production requirements.

The project reduced equipment failure and shutdown risks.
It also demonstrated Zhen Yi’s capabilities in industrial power equipment maintenance, system calibration, and on-site technical service.